Demolition needs careful planning to protect people, neighbouring buildings and the environment. We plan every job properly, from surveys and notifications to waste removal and a clear site at the end.
Because we also build, we leave the site ready for construction to start, with no handover gaps between contractors.
What’s included
- Full and partial demolition of houses, outbuildings and commercial buildings
- Soft strip and internal strip-out
- Site clearance and vegetation removal
- Asbestos surveys and removal arranged through licensed specialists
- Coordination of utility disconnections
- Party wall and neighbour liaison
- Waste segregation, recycling and licensed disposal
- Site levelling and preparation for groundworks

Who we work with
Developers and landowners preparing sites, homeowners replacing an existing house or outbuilding, and businesses refurbishing commercial premises.
How we work
Before work starts we survey the site, check for asbestos and services, and prepare a method statement and risk assessment. We notify neighbours and the local authority where required, then carry out the work safely, recycling as much material as possible.
Frequently asked questions
Do I need permission to demolish a building?
Some demolition needs prior approval from the local planning authority, and buildings in conservation areas or listed buildings have extra controls. We check what applies to your site and handle the applications.
What happens if asbestos is found?
An asbestos survey is carried out before demolition. Where asbestos is present, it is removed by licensed specialists in line with the regulations before other work goes ahead.
Can you build on the site afterwards?
Yes. Most of our demolition projects lead straight into construction, using the same team.
Clearing a site?
Tell us about the building or site and we will arrange a survey and quotation.







